Innovative Building Technology

How Klevabrick ™ Works

Alternative Brick Construction
E

KLEVABRICKS ARE DESIGNED TO

  • Make use of unskilled labour
  • Require reduced startup capital
  • Be manufactured on site
  • Use commonly available material
  • Build up to 3 storeys
  • Be earth tremors and hurricane resistant
  • Expel rainwater from exterior walls
  • Be cast colour through – eliminates painting
E

KLEVABRICK ONLY REQUIRES

  • 25mpa Concrete (mixed to design)
  • Galvanized reinforcing 6mm round bar
  • Moulds
E

KLEVABRICK ELIMINATES

  • Delivery of bricks, blocks and associated sand and cement
  • Lintels
  • Chasing of walls to install electrical conduits and water pipes
  • The need to build cavity walls
  • All wastage of building material
  • The dependency on workmanship
Klevabrick Exterior Heading

Portion of the width is offset both horizontally and vertically to prevent moisture penetration when bolted into a building.

The inner galvanized steel reinforcing is bent is such a manner so as to form loops in provided recesses both horizontally and vertically at each corner, through which 8mm bolts are placed to connect and fasten adjacent Klevabrick ™ together.

Klevabrick End/Corner Heading

Using exterior Klevabricks ™ together with end / corner and interior Klevabricks ™, any building size or type – house, school, office or factory can built.

Klevabrick Interior Heading

The “shape and design” of every Klevabrick ™ ensures that it is easily and always correctly built (connected) into any wall.

Coloured plaster grout to match Klevabrick ™ is used to fill recesses and also applied over interior wall surfaces – smoothed off and floated / rendered – forming a no paint / maintenance free finish.
Dual conduits are cast into Klevabrick ™ to enable water pipes and electrical cables. Eliminating wall chasing.
Coloured Plaster Grout
Dual conduits are cast into Klevabrick
Coloured plaster grout to match Klevabrick ™ is used to fill recesses and also applied over interior wall surfaces – smoothed off and floated / rendered – forming a no paint / maintenance free finish.
Coloured Plaster Grout
Dual conduits are cast into Klevabrick ™ to enable water pipes and electrical cables. Eliminating wall chasing.
Dual conduits are cast into Klevabrick

Klevabrick ™ bolted together in a corner wall.

Klevabrick bolted together in a corner wall

Klevabrick ™ bolted together in a exterior wall.

Klevabrick bolted together in a exterior wall

With all the Klevabricks ™ bolted into a building and the first course into the raft foundation slab, the 2 x horizontal and 2 x vertical reinforcing, per Klevabrick ™ forms a steel cage around the building. This reduces any risk of movement or cracking to zero.

Copyright © 2017, 2018 Klevabrick | Design by Creative Grind